McAvoy Safe Space prefabricated modular units are being used in Jewel & Esk Valley College, Edinburgh
Project: Decant facility for 1200 pupils and storage facilities at Jewel & Esk Valley College, Edinburgh during a major redevelopment project at the school required by Miller Construction, the contractor for the project.
Client: Speedy Hire
Size: 2,880m2
The McAvoy Solution
McAvoy Off-site Prefabricated Modular Building Solutions supplied 98 prefabricated modular bays, configured in three lines and double-stacked which were all linked via corridor walkways. A separate 7 unit installation was also supplied for use as a music block. Another key feature of this project was a huge open plan area which we designed to meet this exacting requirement.
McAvoy’s Safe Space highly secure, vandal resistant prefabricated modular units were required for this project to ensure a comfortable environment for pupils and staff and also for the safe protection of high value musical equipment.
This very large two-storey facility was manufactured and installed within a total of 12 weeks from the date of order.
McAvoy Safe Space Prefabricated Modular Range is designed around the principals of comfort, flexibility and security – the internal layout can be tailored to individual needs and the structure can be easily extended, rearranged or even relocated.